Machines in assembly this week
[2 sets] of fully automatic gable top carton filling machines for [dairy] applications, destined for [a client in the Middle East]
[1 set] of semi-automatic carton filling machine for [sauce] products, ordered by [a Southeast Asian customer]
[1 set] of granule gable top filling machine now at the final wiring stage
Each machine is built to order in our own workshop - from stainless steel frame welding and PLC wiring to final assembly - so quality control starts long before the testing stage.
72-hour running test before packing
Every filling machine leaves our factory only after a full running test with water [and the customer's actual product where available]. Our engineers check filling accuracy, sealing temperature, carton forming and capping performance under continuous operation, and only sign off when the output and reject rate meet the agreed standards. This week, [the first dairy machine] has already entered its testing phase, and we will share the running video with the customer before packing.
Packing and shipment
Machines that passed testing are being packed in export-standard wooden cases with moisture-proof film inside. The first container is scheduled to leave [Shenyang] for [port] in late November, together with spare parts and operation manuals prepared for each customer.
Visit our factory anytime
If you are planning a gable top carton filling project, you are always welcome to visit our workshop in Shenyang and see the machines under real production and testing conditions. Can't travel? Send us your product and required capacity - we can arrange a live video test run.
|
Contact: market@sybeiya.com |
+86 133 4246 3660 |
